Summer 2009 Projects
2008 Wilderness Canoe Base Accomplishments
- Finished Septic infrastructure on Cove and of Pinecliff, Stillwater, Med Center, Trailshack and Morningside complex.
- Brought potable water infrastructure back to the Cove
- Remodeled Ledge and Snowshoe
- Added a wood stove to Beavertail for winter use
- Rebuilt the sauna, deck and dock.
- Started construction on the Trailshack, 2 camper cabins and 3 staff cabins
- Finished Cephas cabin
- Removed old electrical infrastructure and started relaying new lines.
- Hand dug 2 outhouse holes
- Replaced the kitchen range
- Raised $245,000 and was matched by Thrivent with another $100,000
- Created 2 solitude and meditation/prayer locations on Dominion Island
- Reopened the Janzig and Muus Trails
- Re-decked Chapel dock
2009: To Do
- Finish Trailshack,2 camper cabins, 3 staff cabins
- Lay all new electrical infrastructure in the cove
- Build 7 outhouses
- Replace 2 exhaust hoods in the Kitchen
- Replace dishwasher
- Create strategy to finish the rebuilding vision beyond the insurance money
- Build drying rack area
Wilderness Canoe Base
12477 Gunflint Trail
Grand Marais, MN 55604
Phone:
(218)-388-2241
Fax:
(218)-388-9400